Blacksmith - forge manual.pdf

(328 KB) Pobierz
instructions.qxd
PORTABLE FORGE
OPERATING AND REFRACTORY LINING INSTRUCTIONS
Components for assembling your portable forge
include (1) Case, (2) face plates, (3) doors: 1- plain,
1- 2½”x 6” opening, 1- 2½”x 2½” opening, (1) burner
assembly, ¼-20 x ½” bolts and nuts, ceramic liner
and assembly instructions. Regulator, hose and ball
valve not included. Call 800-944-6134 to order
additional doors.
©2002 Hoffmann Publications, Inc.
Publishers of the Blacksmith’s Journal
P.O. Box 1699
Washington, MO 63090 USA
573-237-8882
263654466.003.png
PORTABLE FORGE
OPERATING AND REFRACTORY LINING INSTRUCTIONS
WARNING
FOR YOUR SAFETY
THESE INSTRUCTIONS ARE INTENDED
AS AN AID TO AN INDIVIDUAL FAMILIAR
WITH THE OPERATION OF A GAS
FORGE. IF YOU HAVE NEVER USED A
GAS FORGE, SEEK HELP IN LEARNING
GENERAL OPERATING AND SAFETY
PROCEDURES FIRST. READ THESE
INSTRUCTIONS THOROUGHLY BEFORE
ATTEMPTING ASSEMBLY, INSTALLATION
AND USE OF YOUR FORGE. FAILURE
TO DO SO MAY RESULT IN PERSONAL
INJURY.
-Do not store gasoline or other flammable
vapors or liquids, or other combustible materi-
als in the vicinity of your forge.
-Keep LP gas tanks at least four feet away
from the forge.
-Keep hoses, valves and gauges away from
heat generated by the forge or forge doors.
-Use only in a well ventilated area.
-If you smell gas: shut down the forge imme-
diately and check for leaks. Do not rely on
smell alone; use a fuel gas and CO detector
to find leaks.
The user of this forge and burner assumes all liability and responsibility for proper installation, maintenance and
use of this forge and burner, and the maker is in no way responsible or liable for the failure of the user to observe all
safety precautions in the use of this product.
ASSEMBLY
There are four parts to
this forge: 1. Case, 2.
Face Plate, 3. Door,
and 4. Burner
Assembly. To assem-
ble, install the ceramic
liner as shown on p.
3. Bolt the two face
plates to the case
using the supplied ¼-
20 bolts and nuts.
Slide the burner
assembly into the
square tube located
on the side of the
forge. Align the end
of the burner flush
with the interior of the
forge and secure with
the set screw.
ceramic
wool liner
1.
¼”x 1”
bolt and
nut (7)
2.
3.
4.
hearth block
¼”x 1” set
screw (4)
2.
263654466.004.png
CERAMIC LINER
Your forge is supplied with a ceramic wool liner, hard ceramic hearth floor block and cast-
in-place ceramic doors. The wool liner is already cut to size. To install: 1. Seperate the
wool into two strips from the end to the burner tube opening. 2. Slip the wool over the
burner tube and wrap it around the interior of the forge housing, tucking one layer under
the other at the end. 3. Seperate additional ½” thick strips, roll them up and insert into the
upper corners of the case. Place the hearth floor block in the bottom of the case, between
the ends of the wool liner. After bolting the case together line up the holes in the face
plate and hearth block and insert the set screws to hold the block in place. It is strongly
recommended that you paint your forge with a high temperature paint such as “Rust-
Oleum High Heat” paint (good to 1200°F).
1.
2.
3.
SETUP
Your forge can be mounted on a steel bench or table, pedestal, stand or swinging arm.
Allow plenty of space behind and around the forge for handling stock. Hardware needed
includes a regulator, (for example a Fisher type 67, available at most propane distribu-
tors), ball valve and hose. Locate the LP tank (40-100 lb portable tank recommend) away
from the forge with the regulator mounted to it. Attach the ball valve to the regulator and
connect to the forge using a hose with ¼” NPT fittings.
3.
263654466.005.png 263654466.006.png 263654466.001.png
 
regulator
ball type
shut-off
valve
hose with ¼”
NPT fittings
OPERATION
WARNING: Never rapidly heat a forge with newly cast refractory. Before you can
use your forge you must first drive moisture out of the cast refractory by heating slowly.
WARNING: Never leave the forge unattended while it is running.
To start your forge: 1.close the ball valve and open the LP tank valve all the way. 2. Set
the pressure at the regulator to 25lbs. and make sure the burner draft control is at least
half open. 3. Stand away from the hearth opening, and place a small wad of burning
newspaper in the forge and slowly begin opening the ball valve. 4. Once the forge starts,
open the ball valve all the way. After about 10 minutes the forge will reach forging temper-
ature and the draft control can be adjusted to achieve a neutral flame (close down, then
open to a point where a neutral flame is achieved). The forge operates at a gas pressure
between 15 and 35 lbs. Forging range is between 20-25 lbs and welding range is
between 25-30 lbs. Operating pressures below 15 lbs will cause the burner to sputter,
indicating that it is no longer drawing air. Choose a door with the smallest opening need-
ed to do the work at hand. Do not close off the entire heating chamber with two solid
doors. To shut down, close the ball valve, then the LP tank valve. Note: This forge is
deigned to work up to 2000 ft. above sea level. The burner jet is interchangeable and can
be replaced to work at higher elevations.
4.
263654466.002.png
Zgłoś jeśli naruszono regulamin