Knitting - Vogue - ClassicElite.pdf
(
167 KB
)
Pobierz
Skacel.pdf
AS SEEN IN
VOGUE KNITTING’S
25th ANNIVERSARY ISSUE
• FALL 2007
VOGUE
knitting
VOGUE
knitting
FALL 2007
®
®
Shirley Paden’s slim-fitting colorwork
dress features A-line shaping, back-
buttoned placket and crocheted edgings.
Size for Small/Medium (Large/
X-Large). Shown in size Small/Medium.
2
5
VK
SILVER ANNIVERSARY
KNITTED MEASUREMENTS
• Bust 34 (40)"/86 (101.5)cm
• Length 32 (33)"/81 (83.5)cm
MATERIALS
• 7 (9) 1≥oz/50g spools (each approx 143yd/
131m) of Skacel Collection, Inc.
Karat
(ray-
on/polyester metallic) in #20 black (A)
• 5 (7) spools in #02 silver (B)
• One pair each sizes 5, 6, 7 and 8 (3.75, 4, 4.5
and 5mm) needles OR SIZE TO OBTAIN
GAUGES
• Circular needle size 7 (4.5mm) 32"/82cm length
and 1 extra size 5 (3.75mm) straight needle
• Size D-3 (3.25mm) crochet hook
• Stitch holders, eight 1"/25mm buttons and
cotton waste yarn
NOTES
1)
The shaping in this dress is made by
changing the needle size, instead of using
increases or decreases.
2)
For a gauge swatch, use provisional cast-
on and ch 45. With size 8 (5mm) needles,
pick up 43 sts and work in chart pattern
with a garter st selvage (knit the first and
last st of every row) for 28 rows. Cont in
chart pat, changing to the next size small-
er needle every 28 rows until all needle
sizes have been used.
GAUGES
• 41 sts = 7"/17.5cm and 28 rows = 4√"/
10.5cm using size 8 (5mm) needles.
• 41 sts = 6≥"/17cm and 28 rows = 4µ"/
11cm using size 7 (4.5mm) needles.
• 41 sts = 6µ"/16cm and 28 rows = 4"/10cm
using size 6 (4 mm) needles.
• 41 sts = 5∫"/15cm and 28 rows = 4"/10cm
using size 5 (3.75 mm) needles.
TAKE TIME TO CHECK GAUGES.
PROVISIONAL CAST-ON
With crochet hook and waste yarn, make a
sparkle!
SKACEL COLLECTION INC. KARAT
(rayon/polyester metallic) in #20 BLACK
and #02 SILVER
crochet chain with 4 ch more than in the cast-
on row. Leaving a 4 (5)yd/3.5 (4.5)m tail to
use later for bind-off, beg with the second ch
from the end of the chain, and pick up the
number of sts to be cast on.
When the knitting is finished, return to the
beginning of the cast-on row. With the same
needle used for picking up the sts, slowly
remove the waste yarn, and pick up the sts
one at a time. Bind off firmly.
FRONT
With crochet hook and cotton waste yarn, ch
127 (147). Using size 7 (4.5mm) needle,
with A, pick up 123 (143) sts in the chain.
Leave a 4 (5)yd/3.5 (4.5)m yarn tail long
enough to bind off all 123 (143) sts. P 1 row.
Change to size 8 (5 mm) needles and work in
chart pat as foll:
For Size Small/Medium—
Row 1 (RS)
K1
(selvage st), work 40-st rep 3 times, work
last st of chart, k1 (selvage st).
For Size Large/Extra Large—
Row 1 (RS)
K1 (selvage st), work last 10 sts of rep, work
40-st rep 3 times, work first 11 sts of rep
once more, k1 (selvage st).
For All Sizes—
Cont in chart pat as estab-
lished, changing needle sizes to shape the
dress as foll: Work 24 chart rows using size
8 (5mm) needles. Change to size 7 (4.5mm)
needles and work 52 rows. Change to size 6
(4mm) needles and work 56 rows. Change
www.skacelknitting.com
www.vogueknitting.com
INTERNATIONAL
to size 5 (3.75mm) needles and work 36
rows—168 rows in total and piece should
measure approx 25"/63.5cm from beg.
Armhole shaping
Cont with size 5 (3.75mm) needles, bind off
4 (5) sts at beg of next 2 rows, 3 sts at beg of
next 2 (4) rows, 2 sts at beg of next 6 rows, 1
st at beg of next 4 (6) rows—93 (103) sts.
Work even for 14 (18) rows.
Neck shaping
Next row (RS)
2nd ball of B and work to end. Working both
sides at once, bind off from each neck edge 3
sts twice, 2 sts 3 (4) times, dec 1 st every
other row 3 (2) times. Work even for 3 rows.
Place rem 24 (27) sts each side on holders.
BACK
Work as for Front until 140 (148) rows have
been worked in chart pat.
Divide for center back placket
Next row (RS)
Work 60 (70) sts, inc 1 st in
next st, join 2nd balls of A and B and work
rem 62 (72) sts. Working both sides at once,
Work across 24 (27) sts and
place on holder, bind off rem 23 (25) sts for
back neck; bind off 23 (25) sts for back neck,
work across rem sts and place on holder.
FINISHING
Remove waste yarn from cast-on row, and
with size 7 (4.5mm) needles and A, bind off.
Join shoulder sts using 3-needle bind-off.
With crochet hook and A, work 1 row sc then
1 row of reverse sc (from left to right) evenly
around neck edge. Sew side seams. With cro-
chet hook and A, work 1 row sc then 1 row of
reverse sc evenly around each armhole.
Back button band
With RS facing, crochet hook and A, beg at the
top Back RH side, work as foll:
Row 1
Work
49 sc from top of neck edging to base of the
placket, 3 sc around base, work 49 sc to top of
LH side of neck border. Ch 1, turn.
Row 2
Work 1 sc in each sc. Ch 1, turn.
Row 3
Make
8 button lps as foll: 1 sc in top sc, *ch 3, skip
2 sc, 1 sc in each of next 4 sc; rep from 6 times,
end in st 43, skip 2 sc, work 1 sc in rem 4 sc to
base of placket, 1 sc in 3 base sts, 1 sc in each
of 49 sc to top of LH side. Sew 8 buttons along
the LH side opposite the button lps.
Work 39 (43) sts, join 2nd
ball of A and bind off center 15 (17) sts, join
64
63
62
61
60
59
58
57
56
55
54
53
52
51
50
49
48
47
46
45
44
43
42
3
41
40
38
37
36
35
34
33
3µ (3≥)"
32
2
31
6≤ (7)"
30
28
27
11"
26
25
24
23
FRONT
&BACK
22
21
20
25"
19
18
17
16
15
14
13
12
11
10
9
20≥ (24)"
8
17 (20)"
7
6
5
Color Key
4
3
Black
Silver
2
1
40-st rep
www.skacelknitting.com
© SoHo Publishing Company 2007. All rights reserved. Individual, non-commercial use only. Sale,
any other commercial use and any reproduction, publication or distribution prohibited.
www.vogueknitting.com
work even on 62 (72) sts each side until same
length as back to armhole. Shape armhole as
for back—47 (52) sts each side. Work even
until same length as front to final bind-off,
end with WS row.
Next row (RS)
Plik z chomika:
wroblelz
Inne pliki z tego folderu:
p0058.jpg
(382 KB)
p0059.jpg
(475 KB)
Obraz 023.jpg
(39 KB)
Czapka na drutach.doc
(44 KB)
Dec 08 cable hat.pdf
(67 KB)
Inne foldery tego chomika:
bordiury 01
bordiury 02
bordiury 03
bordiury 04
nowy1
Zgłoś jeśli
naruszono regulamin