AVDO Installation Guide.pdf
(
128 KB
)
Pobierz
<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01//EN" "http://www.w3.org/TR/html4/strict.dtd">
AVDO
INSTRUCTIONS
Installation and Commissioning Guide
Adjustment Procedure
The following is intended to be a simple
guide to the setting of the AVDO. As
detailed design information is rarely
available for domestic systems this
approach is usually more appropriate
than the more scientific method often
applied to the AVDA, AVDSA and IVDA
commercial by-pass valves.
1. With boiler/system cool, set AVDO to
max (0.5 bar).
2. Switch heating system/boiler/pump
on.
3. Reduce setting until AVDO is just
open (by-pass/valve starts to get hot).
4. Turn adjuster back (anti-clockwise)
one revolution (ie. valve closes).
5. AVDO will automatically open when
system flow reduces.
6. Setting can be lead-seal locked.
The AVDO is an automatic by-pass
control valve intended for use in
domestic central heating systems. Its
function is to allow a minimum flow to be
maintained through the boiler as the
water flow through the pump is reduced
by, for example, radiator thermostats.
The AVDO automatically opens and
closes dependent upon system load;
when the radiator thermostats are open
and calling for heat the AVDO remains
closed, allowing the full boiler/pump
output to circulate. As radiator
thermostats start to close so the AVDO
opens to allow a flow through the
bypass.
Specifications
Max. working pressure: ............. 10 bar
Max. differential
pressure: .................................. 0.5 bar
Setting range: ................. 0.05-0.5 bar
Test pressure: .......................... 16 bar
Max. flow
temperature: ............................. 90 °C.
120 °C (intermittent)
The AVDO automatic bypass control
valve is factory set to 0,2 bar (20 kPa).
The valve can be adjusted at the time of
installation to suit the central heating
system. A simple method of adjustment
is described in the next column.
VI.55.M7.02
8-1999
DKCD
Plik z chomika:
januszmaka
Inne pliki z tego folderu:
AVDO Automatic Bypass Control Data Sheet.pdf
(576 KB)
AVDO Installation Guide.pdf
(128 KB)
BEM5000 Boiler Energy Manager.pdf
(38 KB)
BEM5000 Connection Diagram.pdf
(69 KB)
BEM5000 Installation Instructions.pdf
(120 KB)
Inne foldery tego chomika:
Frost Thermostats
Heating Controls
Hot Water Controls
Programmers Time Clocks
Zgłoś jeśli
naruszono regulamin